Abstract : Line balancing is a tool that can be used to optimize the workstation or assembly line throughout. This tool will
assist in the reduction of the production time and maximizing output or minimizing the cost. The line balancing problem is
often expressed in one possible term which is to determine the minimum number of work stations needed and task allocation
to produce maximum output rate. Multi model production lines having lot of different sizes each lot having different product
and their processing time is also different so it is very difficult to balance the line by any mathematical model , this type of
lines are easily balanced by using traditional method of balancing the line ,I used traditional method for balancing the line.
The research shows that this traditional method for balancing the line has increased the machine utility by 80 to 100%
Keywords - Scheduling, Line Balancing, grinding wheel mills, modular production, productivity.
Type : Research paper
Published : Volume-5,Issue-11
DOIONLINE NO - IJMPE-IRAJ-DOIONLINE-9883
View Here
Copyright: © Institute of Research and Journals
|
|
| |
|
PDF |
| |
Viewed - 102 |
| |
Published on 2018-01-09 |
|