Paper Title
Time Indexed Scheduling of Single Production Line to Minimize the Total Prioritize Customer Tardiness in Carpet Industry
Abstract
In this research, an optimization model is developed to determine the best schedule in a factory specialized in
carpet production. The developed model considers most of realistic considerations, such as taking the prioritization of
customer tardiness, but not the products. Different data sets were taken from the demand records in the factory and solved by
CPLEX- Concert Technology. The results shows that schedules resulted from the model save up to 4.4% of total prioritized
tardiness compared with traditional methods that were used in the factory in most of cases. Some better results,
suchas22.2%ofimprovementisachievedinadata-set, where more investigation is required to analyze such results.
Keywords – Production Scheduling