Paper Title :Setup Time Reduction For CNC Hobbing Machine Implementing SMED And Design Of “Split Fixture”
Author :Karan Sharma, Naik Nithesh, Arun Prabhu, George Varghese
Article Citation :Karan Sharma ,Naik Nithesh ,Arun Prabhu ,George Varghese ,
(2014 ) " Setup Time Reduction For CNC Hobbing Machine Implementing SMED And Design Of “Split Fixture” " ,
International Journal of Mechanical and Production Engineering (IJMPE) ,
pp. 83-88,
Volume-2,Issue-11
Abstract : Setup reduction is a process through which the total time required to changeover or set-up equipment or a work
center is dramatically reduced through a systematic, problem-solving, waste-eliminating approach. It is an important tool in
lean production to realize quick setup change and meet the demands of individualized customers. The setup time reduction
for CNC hobbing machine has been done by implementing SMED (Single Minute Exchange of Die) technique, optimal crane
operation and by incorporating the design of “Split fixture”. The execution of this project has successfully managed to reduce
02:28:30 of setup time per day of the CNC hobbing machine and further has the reduction potential of reducing 00:55:15 of the
setup time per day by incorporating the “Split fixture”.
Type : Research paper
Published : Volume-2,Issue-11
DOIONLINE NO - IJMPE-IRAJ-DOIONLINE-1418
View Here
Copyright: © Institute of Research and Journals
|
|
| |
|
PDF |
| |
Viewed - 80 |
| |
Published on 2014-11-01 |
|