International Journal of Mechanical and Production Engineering (IJMPE)
.
Follow Us On :
current issues
Volume-12,Issue-1  ( Jan, 2024 )
Past issues
  1. Volume-11,Issue-12  ( Dec, 2023 )
  2. Volume-11,Issue-11  ( Nov, 2023 )
  3. Volume-11,Issue-10  ( Oct, 2023 )
  4. Volume-11,Issue-9  ( Sep, 2023 )
  5. Volume-11,Issue-8  ( Aug, 2023 )
  6. Volume-11,Issue-7  ( Jul, 2023 )
  7. Volume-11,Issue-6  ( Jun, 2023 )
  8. Volume-11,Issue-5  ( May, 2023 )
  9. Volume-11,Issue-4  ( Apr, 2023 )
  10. Volume-11,Issue-3  ( Mar, 2023 )

Statistics report
Apr. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 130
Paper Published : 2388
No. of Authors : 6802
  Journal Paper


Paper Title :
Multi-Reservoir Operational Management for Optimal Electricity Production of Namkhan 2 and 3 Hydropower Plants

Author :N. Bangsulin, A. Promwungkwa, K. Ngamsanroaj

Article Citation :N. Bangsulin ,A. Promwungkwa ,K. Ngamsanroaj , (2017 ) " Multi-Reservoir Operational Management for Optimal Electricity Production of Namkhan 2 and 3 Hydropower Plants " , International Journal of Mechanical and Production Engineering (IJMPE) , pp. 56-61, Volume-5,Issue-2

Abstract : The objective of this research was to study the reservoir operation management for optimizing electricity production, reservoir control, and water supply to the downstream river. The two medium size hydropower plants located in northern Laos, which are Namkhan 2 and 3 hydropower plants, are the case study of this work. The multireservoir algorithms used are streamflow synthesis and reservoir regulation algorithm, and the improved particle swarm optimization algorithm for a long-term multi-reservoir system operation. The simulation software used is HECResSim3.1 and the input data used is the technical data of both power plants. The simulation results show that electricity generation is increased from 767.85 to 795 GWh/year, which is counted for 3.53% as compared to normal water year. The water released through the spillway in the rainy season decreases 404 million cubic meters for the averaged wet year. For the drought year, water of both hydropower plants can be managed to supply two more months for the power production purpose. Keywords— Multi-reservoir Management, Electricity Production, Operation, Optimization.

Type : Research paper

Published : Volume-5,Issue-2


DOIONLINE NO - IJMPE-IRAJ-DOIONLINE-7011   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 88
| Published on 2017-04-19
   
   
IRAJ Other Journals
IJMPE updates
Volume-12,Issue-1 (Jan, 2024 )
The Conference World

JOURNAL SUPPORTED BY