International Journal of Mechanical and Production Engineering (IJMPE)
.
Follow Us On :
current issues
Volume-12,Issue-1  ( Jan, 2024 )
Past issues
  1. Volume-11,Issue-12  ( Dec, 2023 )
  2. Volume-11,Issue-11  ( Nov, 2023 )
  3. Volume-11,Issue-10  ( Oct, 2023 )
  4. Volume-11,Issue-9  ( Sep, 2023 )
  5. Volume-11,Issue-8  ( Aug, 2023 )
  6. Volume-11,Issue-7  ( Jul, 2023 )
  7. Volume-11,Issue-6  ( Jun, 2023 )
  8. Volume-11,Issue-5  ( May, 2023 )
  9. Volume-11,Issue-4  ( Apr, 2023 )
  10. Volume-11,Issue-3  ( Mar, 2023 )

Statistics report
Apr. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 130
Paper Published : 2388
No. of Authors : 6802
  Journal Paper


Paper Title :
A Case Study Of An Office Complex Project For The Kuwait Oil Company (Koc) Under Fixed Price Lump Sum (Modified) Contract

Author :Abdullah Al Yousef, Jawaid Anwar

Article Citation :Abdullah Al Yousef ,Jawaid Anwar , (2015 ) " A Case Study Of An Office Complex Project For The Kuwait Oil Company (Koc) Under Fixed Price Lump Sum (Modified) Contract " , International Journal of Mechanical and Production Engineering (IJMPE) , pp. 36-39, Volume-3,Issue-5

Abstract : A case study is done in order to evaluate the FIXED PRICE LUMP SUM (MODIFIED) project and lesson learnt during its execution to further improve it. Company prepared approximately 150 drawings of Architectural, Civil & Structure, Electrical, Mechanical, HVAC, Instrumentation (Building, Security and Life Safety Management), IT/Telecom, LAN and respective technical specifications under each discipline along with KOC standards, specifications, drawings and reference drawings in order to define the basic scope of work (FEED). These documents and their priorities were defined in MOA (Memorandum of Agreement). Contractor developed the complete detailed design based on the above documents along with contract specification and different attachments to Form of Tender and executed the project as per contact term and condition. The consultant was chosen from approved list of consultants of Kuwait Oil Company under Category 39 (Civil Works Consultants). Keywords- Complex Project, KOC, Drawings, MOA

Type : Research paper

Published : Volume-3,Issue-5


DOIONLINE NO - IJMPE-IRAJ-DOIONLINE-2023   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 76
| Published on 2015-05-04
   
   
IRAJ Other Journals
IJMPE updates
Volume-12,Issue-1 (Jan, 2024 )
The Conference World

JOURNAL SUPPORTED BY