International Journal of Mechanical and Production Engineering (IJMPE)
.
Follow Us On :
current issues
Volume-12,Issue-1  ( Jan, 2024 )
Past issues
  1. Volume-11,Issue-12  ( Dec, 2023 )
  2. Volume-11,Issue-11  ( Nov, 2023 )
  3. Volume-11,Issue-10  ( Oct, 2023 )
  4. Volume-11,Issue-9  ( Sep, 2023 )
  5. Volume-11,Issue-8  ( Aug, 2023 )
  6. Volume-11,Issue-7  ( Jul, 2023 )
  7. Volume-11,Issue-6  ( Jun, 2023 )
  8. Volume-11,Issue-5  ( May, 2023 )
  9. Volume-11,Issue-4  ( Apr, 2023 )
  10. Volume-11,Issue-3  ( Mar, 2023 )

Statistics report
Apr. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 130
Paper Published : 2388
No. of Authors : 6802
  Journal Paper


Paper Title :
Stochastic Lot-Sizing Schedule of Production and Remanufacturing in Closed Loop Supply Chain for Construction Waste Recycling

Author :Shi, Shupei, Murata Tomohiro

Article Citation :Shi ,Shupei ,Murata Tomohiro , (2020 ) " Stochastic Lot-Sizing Schedule of Production and Remanufacturing in Closed Loop Supply Chain for Construction Waste Recycling " , International Journal of Mechanical and Production Engineering (IJMPE) , pp. 50-55, Volume-8,Issue-6

Abstract : This study addresses a stochastic multi-product lot-sizing (re)manufacturing problem in construction enterprise employing a closed-loop supply chain strategy. The finished products required at the construction sites are provided by production resource using virgin material and remanufacturing resource using recyclable material. Uncertain return and demand lead to unequal information on each CLSC links. The mismatch of demand and supply result in high inventory cost which directly affect the difficulty of establishing anoptimallot-sizing production schedule. For this NP-hard problem, we proposed a nonlinear model formula that is approximated by sample average approximation (SAA) method to transform into a deterministic problem. The experiments demonstrated the proposed method can generate the optimal configuration,thereby reducing the total cost. Keywords - Construction waste recycling,Stochastic programming, Multi-product multi-period lot-sizing schedule optimization,Closed-loop supply chain,SAA,Uncertainty.

Type : Research paper

Published : Volume-8,Issue-6


DOIONLINE NO - IJMPE-IRAJ-DOIONLINE-17241   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 75
| Published on 2020-08-26
   
   
IRAJ Other Journals
IJMPE updates
Volume-12,Issue-1 (Jan, 2024 )
The Conference World

JOURNAL SUPPORTED BY